Meetings - 2023
Engineering Report 28
Engineering Report (EREP) 28
This modification was raised to assess the requirement for additional clarity regarding EREC P28, provided in the form of an engineering technical report. The role of this workgroup will be to assess the requirements set out within EREC P28 Issue 2 and provide an additional level of clarity to generators, developers, and customers. No changes to the requirements of EREC P28 are being considered as part of this modification.
Affiliated Documents
Terms of Reference (Draft)