DCRP/24/01/MP Minor technical modifications to EREC G98 and G99

The modifications proposed here are a series of issues raised since the last modifications to EREC G98 and G99. They span all Types of Power Generating Modules (PGM), ie Types A – D and include some new requirements as well as clarifications to existing requirements. This proposal also includes minor associated modifications to the Distribution Code.

The RTA was drafted and approved by the DCRP before submission to Ofgem on 7 October 2024, the modification was then approved 24 February 2025, with an agreed publication date of 10 March 2025.

DCRP/24/01/MP Consultation pack

DCRP/24/01/MP Decision Letter

DCRP/25/02/PC Annual Revision to the Distributed Generation Connection Guides

The Distributed Generation Connection Guides (DG Guides) have undergone an annual revision in line with the requirements of the Distribution Code of Great Britain with a consultation due for release in March 2025. This modification proposes to collate the current guides into a single guidance document covering EREC G98 and EREC G99.

DCRP/25/02/PC - Consultation Pack